Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

MoEF&CC accords EC to Gujarat State Petronet

Friday, 16 Oct 2020
Share this on :
The Ministry of Environment, Forest & Climate Change (MoEF&CC) has accorded environmental clearance to Gujarat State Petronet.

The EC has been accorded for laying 36/30 inch natural gas transportation pipeline from Anjar (Kutch) to Chotila (Surendranagar) covering approximate length of 196.14 km with associated facilities.

The associated facilities include eight sectionised valve station, one intermediate pigging station and two dispatch terminal/receiving terminal of capacity 23.13 MMSCMD.

The estimated proposed project cost is Rs 1,058.40 crore. The recurring cost during operation and maintenance will be about Rs 77 lakh per annum.

Total average water requirement during construction phase will be 50-60 cum per day and during operation phase only 20 cum per day for domestic purpose and for greenbelt area, the water requirement will be mostly met from tankers.

New Password
Confirm Password