NLC India (NLCIL) has issued a tender for setting up of a 200 MW ISTS-connected wind power project on PAN India basis.
The scope of work covers land procurement, design, micro-siting, engineering, site development, manufacturing, supply, storage, transport, erection, installation, testing, and commissioning of the 200 MW wind power project. It further includes setting up the power evacuation system at ISTS substations at 220 kV or above (EHV), along with connectivity, GNA, and tariff metering approvals.
The work will be executed on a turnkey basis, wherein the selected contractor will also undertake performance guarantee tests and O&M for 10 years, excluding one-year warranty O&M.
The closing date for bid submsisio nis 07 October, 2025.