Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NTPC forays into hydrogen hub development in Andhra Pradesh

Wednesday, 24 May 2023
Share this on :

NTPC has commenced work on a hydrogen hub in Andhra Pradesh as part of its foray into hydrogen and energy storage solutions. The hub will facilitate the development of manufacturing facilities in the area of green hydrogen and green ammonia-related equipment, production, and export.

The initial phase of the hydrogen hub project will be implemented at Pudimadaka, with an initial capacity of 1,500 tpd.

Additionally, the power company has signed a non-binding memorandum of understanding (MoU) with the Andhra Pradesh government for the development of a hydrogen hub near Visakhapatnam.

Overall, NTPC aims to install 13.4 GW of solar and 20 GW of renewable energy and storage capacity by 2030.

New Password
Confirm Password