Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Patna Metro successfully conducts trial operations on Line 2 stretch

Tuesday, 09 Sep 2025
Share this on :

The Patna Metro Rail Project reached a crucial milestone on 07 September, 2025, as the first fitness trial runs were successfully conducted on Line 2.

Spanning 14.05 km between Patna Junction Railway Station and New ISBT, Line 2 features 12 stations. The initial trial run covered the stretch between Patna Depot and Bhoothnath Metro Station, where multiple critical systems were tested to ensure safe and reliable metro operations. Officials confirmed that the tests included assessments of train movement, braking, signaling, and communication systems.

Urban Development and Housing Department (UDHD) Minister Jibesh Kumar recently inspected the Metro Depot and the Zero Mile Metro Station, expressing satisfaction with the pace of work. "The project will significantly transform public transport in Patna," he remarked.

The Patna Metro Project, designed as a Mass Rapid Transit System (MRTS), is currently under construction. Phase 1 comprises two corridors with 24 stations. Line 1 (Danapur Cantonment–Khemni Chak) spans 16.86 km with 14 stations, while Line 2 (Patna Junction–New ISBT) runs 14.05 km with 12 stations.

New Password
Confirm Password