Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Suzlon, Vestas in fray for GSPC's 200 MW power plant

Saturday, 17 Jan 2009
Share this on :

Suzlon and Vestas are the final bidders for Gujarat State Petroleum Corporation's (GSPC) proposed 200 MW wind power plant.

Technical bids have been disclosed and are being scrutinised at present while financial bids will be announced after the scrutiny is over.

The Rs.1,200 crore project will be awarded to the selected bidder to build, commission and operate for 10 years period. The company will also have to identify and acquire the land and commission the plant within six months of awarding the contract.

Also See:

GSPC to sign MoU with Gujarat govt for wind power plant

Related Links:
Project profile

New Password
Confirm Password