Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Virar-Alibaug Corridor design nearing completion

Tuesday, 03 May 2011
Share this on :

The feasibility study of the proposed Virar-Alibaug multi-modal corridor is nearing completion. Louis Berger & Group, the consultants for the project, is expected to submit the final reports in a couple of months.

The corridor proposed from Diva-Vasai rail line intersection on NH-8 up to Alibaug will cover a distance of about 140 km. As per the design, the corridor will be aimed to provide the vehicular speed of 120km/hour. The MMRDA is expected to take up the decisions pertaining to implementation and financial aspects of the project.

Related Links:
Project profile

New Password
Confirm Password