Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Kalpataru Power bags Rs.385 crore order

Monday, 09 Mar 2009
Share this on :

Kalpataru Power Transmission has won an order worth Rs.385 crore from Hindustan Mittal Energy, a JV of Hindustan Petroleum Corporation and L.N. Mittal Group, for laying of approx 550 km of 28"/30"/48" pipeline as Part A of Mundra-Bhatinda Pipeline Project for transportation of crude oil from Mundra to Guru Govind Singh Refinery at Bhatinda.

The scope of work also includes one pumping cum Intermediate Pigging (IP) Station at Dhansa, two IP stations, 17 SV stations and one Dispatch station at Kot which involves all civil, electrical, piping, and mechanical and instrumentation work.

The starting point of the pipeline starts at Kot near Mundra in Gujarat and ends at Jhanwar (approx. 30 km south of Jodhpur) in Rajasthan. The project has to be executed in three spreads and is to be completed in 18 months from the date of award.

Related Links:
Project profile

New Password
Confirm Password