Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Ahmedabad to get first continuous East-West road corridor

Friday, 05 Sep 2025
Share this on :

Ahmedabad is set to get its first single, continuous road connecting the western and eastern ends of the SP Ring Road, the Ahmedabad Municipal Corporation (AMC) has announced. Bids for the project are expected to open soon.

The first phase will develop a 10 km stretch from Ognaj to the Dadhichi Bridge in Vadaj at a cost of Rs 100 crore, covering areas including Gota, Chandlodia, Nirnaynagar, Akhbarnagar, and Vadaj Circle. "In the first phase of the East-West Corridor project, we will develop the 10 km stretch from Ognaj to the Vadaj Dadhichi Bridge. This is estimated to cost Rs 100 crore. The design has been finalised, and the file has been submitted to the commissioner for approval to float the tender," an AMC official said.

The road will feature uniform junction designs, pedestrian-friendly pathways, and removal of bottlenecks to ensure smooth traffic flow. The remaining 10 km from Vadaj to SP Ring Road in Odhav will be executed in five phases, with the total project cost estimated at Rs 450 crore. A 25 km north-south corridor costing Rs 250 crore is also under discussion.

New Password
Confirm Password