Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GHMC to build multi-level flyovers on Mehdipatnam–Gachibowli corridor, 398-cr outlay

Thursday, 04 Sep 2025
Share this on :

To address chronic traffic congestion along the key Mehdipatnam–PVNR Expressway–Gachibowli corridor, the Greater Hyderabad Municipal Corporation (GHMC) has announced the construction of multi-level flyovers and grade separators at Rethibowli and Nanalnagar junctions. 

The Rs 398 crore project under the Hyderabad City Innovative and Transformative Infrastructure (H-CITI) initiative, aims to establish a signal-free corridor and significantly improve travel speeds. Of the total, Rs 220 crore will be allocated to the construction of flyovers and grade separators, while the remainder will cover land acquisition, shifting of underground utilities including water and sewer pipelines and power cables, consultancy, incidental works, and installation of noise barriers. 

To be executed on an engineering, procurement and construction (EPC) basis, the project proposals have been invited with a construction period of two years, followed by a two-year defect liability period. The viaduct is being designed for a minimum speed of 40 kmph, with structural components designed up to 80 kmph.

New Password
Confirm Password