Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

KMC Constructions bags National Highway contract from NHAI

Thursday, 27 Oct 2016
Share this on :

KMC Constructions has secured a Rs 1,274 crore contract from National Highways Authority of India (NHAI), for the development of a national highway section in Himachal Pradesh.

A Letter of Award (LOA) for development of the national highway section in Himachal Pradesh was issued by NHAI, under Phase -IV B of National Highways Development Projects (NHDP).

The project includes development of the 26 km long Nerchowk - Pandoh, including Pandoh bypass section of the NH-21.

The project will have two bypasses, which are the Mandi Bypass, approx around eight km; and the Pandoh Bypass of approx five km; three twin tube two lane tunnels; 11 minor bridges; six major bridges; and three vehicular underpasses.

The roadway project will be carried out on engineering, procurement and construction (EPC) mode.

The scheduled time for completion of the project is 30 months from the date of commencement.

New Password
Confirm Password