The Public Works Department (PWD), Assam has invited bids to engage a consultant for the preparation of a detailed project report (DPR) for the construction of the proposed elevated road under Phase-I.
The road will stretch from Capital Point to Rangirkhari in Silchar town. The scope of the consultant will include carrying out bridge investigation, analysis of data, and designing of strengthening scheme, creating sound proposals for construction of three-lanes flyovers and conducting engineering, economic, environment and social studies.
The government of Assam has proposed to construct numbers of flyovers in the state, and once this project turned in to reality, then it will be the longest elevated road in the entire Barak Valley region.
The last date for submission of bids is 15 July 2025.