Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

PGCIL begins commercial operations at 85 MW Nagda Solar Plant in Madhya Pradesh

Friday, 25 Apr 2025
Share this on :

Power Grid Corporation of India (PGCIL) has commenced commercial operations at its 85 MW solar photovoltaic power plant located in Nagda, Ujjain, Madhya Pradesh, as of 24 April, 2025. The project has been implemented through Powergrid Energy Services, a wholly owned subsidiary of the company, according to an official regulatory filing.

The Nagda plant strengthens the company's renewable energy portfolio and is in alignment with the Centre’s commitment to clean energy transition. It represents Powergrid’s strategic focus on green energy diversification, contributing to the national targets for renewable capacity addition. The project adds to the momentum of India’s broader clean energy goals while also promoting localised energy generation and job creation in Madhya Pradesh. 

In a separate but related development, Powergrid also announced the full commissioning of another project, the POWERGRID Raipur Pool Dhamtari Transmission, effective 26 March, 2025. This transmission project was secured via the tariff-based competitive bidding (TBCB) process, further highlighting Power Grid’s execution capabilities across India’s evolving power infrastructure landscape. 

 

New Password
Confirm Password