Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Yanam bridge to be ready by September next

Tuesday, 18 Dec 2001
Share this on :

The 1.8 km long Yanam bridge across the Gowthami branch of the River Godavari is expected to be completed by September 2002. The bridge estimated to cost Rs.110 crore is being constructed by Navayuga Engineering Company Ltd on a build, operate and transfer basis.

 

The bridge extends across the Gowthami branch of the River Godavari, between Yanam in Pondicherry and Yedurulanka in the East Godavari district of Andhra Pradesh.

 

It is expected to help develop the coastal parts of Andhra Pradesh. The bridge will help in improving agri-business and industrial growth in the surrounding areas. It would also benefit the following areas in Andhra Pradesh by reducing distances between them:

 

Areas to benefit from the project

(Distance in kms)

Route

Present Dist.

Post-Bridge Dist.

Dist. Saved

Kakinada-Amalapuram

110

62

48

Kakinada-Razole

120

92

28

Kakinada-Maummidivaram

125

50

75

Kakinada-Narasapur

120

107

13

 

 

 

New Password
Confirm Password