Dilip Buildcon has bagged a back-to-back subcontract from ISC Projects for the Barpali loading bulb at Kusara in the Chakradharpur Division of South Eastern Railway.
The composite work encompasses a wide range of activities, including earthwork for filing and cutting, minor bridge construction, drainage works, protection tasks, track linking, P. Way fittings, and transportation of track materials. Additionally, it involves the construction of service buildings, goomties, sheds for workshops, and other infrastructure like roadwork, circulating areas, and abrasion-resistant concrete flooring. The scope also includes heavy repairs, structural steel work, and ballastless track beams.
The work is set to be completed in 24 months, and the estimated value of the contract is Rs 307.08 crore.