Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Kanpur Metro Project achieves milestone with TBM deployment for Line-2

Tuesday, 01 Apr 2025
Share this on :

The Kanpur Metro Project has successfully deployed its third tunnel boring machine (TBM), "Parvati," at Rawatpur Station for Line 2. The 8.38 km corridor from Agriculture University to Barra-8 will be constructed with this machine.

TBM Parvati, a refurbished Herrenknecht earth pressure balance (EPB) machine, will complete significant tunneling tasks. The machine will carry out tunneling tasks, including a 750 mtrs. tunnel from Rawatpur to Kakadeo and a 700 mtrs. tunnel towards Kakadeo Station box. 

The KNPCC-11 package, awarded in December 2023, is valued at Rs 7.62 billion and has a 30-month completion deadline. 

 

New Password
Confirm Password