The Sabarmati River Front Development Corporation has invited bids for infrastructure works.
The scope of work includes construction of diaphragm wall anchor slab and earth filling with infrastructure services like storm water drainage and interceptor line from upstream of the proposed barrage to ghat at Indira Bridge on the east bank of river Sabarmati in Ahmedabad district of Gujarat.
The estimated value of the work is Rs 149.68 crore with completion period of 12 months.